CKA Christopher Karch & Associates design build, construction & engineering services for heavy and light industrial projects [ezcol_2third]

Industrial Facility Design & Construction Services

Design / Build & construction services are available for heavy and light industrial projects in both private and public sectors. Manufacturing, assembly, warehouse, bottling, shipping, process, and storage facilities for both public and private sector projects are among CKA success stories.

Download Project Sheet [PDF]

Aerex Industries  Industrial Manufacturing Facility

Owner:  Aerex Industries, Inc.

Size:     11,900 Sq Ft Manufacturing Center

Scope:  Construction Management

Cost:    $650,000

CKA provided Engineering and Construction Management services for this State-of-the Art Industrial Manufacturing Facility.  This industrial structure was custom designed and built to meet the client’s needs to incorporate two 25-ton bridge cranes and twenty-four 2-ton jib cranes.  The building is of steel construction that is incorporated into and adjacent to an existing site and building respectively.  The owner is a renowned manufacturer of equipment, piping and appurtenances for the water and wastewater industry.  This project is exemplary of the firm’s ability to provide services of smaller proportions to our growing client base.  

Pratt & Whitney  Manufacturing Building Improvements

Owner:  Pratt & Whitney

Size:     28,000 Sq. Ft.

Scope: Design / Build & Construction Management

Cost:    $3,500,000

CKA provided structural and mechanical design, and construction management for this very visible project within the corporate framework.  Pratt & Whitney has recently undergone a major renovation of the west end of the manufacturing building to facilitate the assembly of new aircraft to be built under a federal contract.  

Aerex Industries  Filter Press & Simplex Pump Station

Owner:  Aerex Industries

Size:     Simplex Pump  Station & Filter Press

Scope:  General Contractor

Cost:   $48,000

CKA provided General Contracting services for the installation of a simplex pump station and filter press.   This project was constructed to remove the sludge off the bottom of large acid tanks used in the pickle and passivation of large stainless weldments.  The installation of this process mechanical system facilitates longevity of the acid far beyond what was previously realized. 

Pratt & Whitney  Remote Test Site Compressor Building

Owner:  Pratt & Whitney Rocketdyne

Size:     284 Sq. Ft.

Scope: Design/Build, Permitting, Construction Management

Cost:   $112,000

CKA provided structural, mechanical, electrical, site civil design and construction management for the construction of a new compressor building at the existing secret remote test facility.  Pratt & Whitney operates an infrared and radar signature testing facility that was in need of additional mechanical and structural facilities expansion.  CKA provided the listed services as engineer of record for this expansion.     

Wellstar Health Systems, Marietta GA  Laundry Water Recycle System

Owner:  Wellstar Health Systems

Size:     175 GPM Laundry Washwater Recycle System

Scope:  Process Mechanical / Electrical / I&C Design and Procurement

Cost:    $245,000

CKA provided process mechanical, electrical, instrumentation system design and procurement services for a 175 gpm laundry washwater recycle system.  The Wellstar Health Systems Laundry is a centralized commercial laundry plant contracted to five major hospitals in the Atlanta, GA area.  This recycling system is the first of its kind to be utilized in this industry. The system is entirely automated and incorporates UV disinfection, and thermal energy management system.  This design has been submitted for patent and plans for marketing and reproduction throughout the country is anticipated.  This project was publicized worldwide on “CNN Headline News” for the innovative water conservation application.

Power Generation System  Patent Received

Owner: John Dubois

Size:     Varies

Scope: Consulting

Cost:    Consulting

CKA provided assistance to the inventor, John Dubois, to identify the design and components necessary to extract energy out of abandoned mine shafts using the encased thermal heat energy and underground water flow.  CKA was contacted by the “inventor” to assist in the creation of a design invention for a power extraction device utilizing, to date, uncapped potential energy lying below the surface in abandoned mine shafts.  The design criteria set forth in our work led to the successful procurement of a US Patent.

Red, White, Blue & Green, LLC  

US Patent No. 8,452,661 B2 Received

Owner:  Christopher Karch, PE

Size: 120V / 230V

Scope: Automated Computerized Car Electric Charging Station

Christopher Karch, PE, through a subsidiary firm, Red, White, Blue & Green, LLC designed a Metering Electrical Car Charging Station with Integrated Expense Tracking and Invoice Capabilities that received a US Patent on May 28, 2013. Christopher Karch, PE, owner of CKA is the “inventor” of the above described device originally intended to serve the commercial hotel/motel industry and the municipal parking garage industry.  The system includes the monitoring, tracking, and invoicing to host computers such as that used in a hotel to streamline and facilitate the invoicing of electrical energy for cars with a typical hotel invoice.  

Pratt & Whitney  E-Area Classified Storage Building

Owner:  Rocketdyne

Size:  4,000 Sq. Ft. Custom Metal High-Bay Storage Building

Scope: General Contractor

Cost:   $725,000

CKA provided general contracting for this state of the art custom high-bay metal building for top-secret classified hardware storage located in Jupiter, FL.  Pratt Whitney / Rocketdyne, a joint venture corporation engaged in the design and fabrication of military and space propulsion systems contracted with CKA to provide a turn-key construction project for their top-secret classified use.  This storage facility was delivered turn-key to the owner and constructed from de-grubbing to lights on in 8 weeks.  The foundation slab was complex in that an integral monolithic curb was constructed.  The shell of this building took all but 13 days from degrubbing to finish fascia, doors, and trim.  The remaining time was spent on interior electric, fire suppression, alarm, and classified monitoring systems.  

 

 

 